Model railroad module construction

Dan’s been in touch with an impressive model railroad module construction for the Benjamin Harrison musuem.

He starts with some back ground:

Benjamin Harrison was the first president to take a train tour of the south and west. He took the trip in his third year as president in 1891.

By this time “whistle stop” campaigning was common. A whistle stop campaign is a trip through a region when running for office.

model railroad module construction overhead view

The train stopped at towns along the route and made campaign speeches. This trip was very long and was unusual in that regard.

The route covered over 5000 miles. He drew large crowds along the way. Most towns and cities had never had a sitting president visit.

whistle stop tour map

An example of a large crowd.

crowd at whistle stop tour

A stop at the bottom of the Royal Gorge in Colorado.

royal gorge railroad

Tools needed for model railroad module construction. Track cutters, needle nosed pliers, files, rail joiners, track nails, and flex track.

tools for model railroad module construction

Tacking down the cork roadbed while the white glue dries.

 laying cord bed HO scale



Model railroad module construction:

The three modules required for the move. It is simple box construction. Where they join I used carriage bolts and wing nuts.

Not shown: where the bolts pass through each module, I inserted a short piece of copper tubing in the hole. This is to prevent over tightening the wing nuts and compressing the softer wood. ( I use this process on the Christmas modules. The holes have gone through 32 ups and downs. )

 HO scale bench

The simple model railroad track plan. The passing (house) track where the station will go. On the single track side notice the slight curve. Thus avoiding a straight along the side look.

 HO scale track plan

The divider back drop. They slip in and out of the “L” shaped blocks for easy construction. Everything on the modules had to be removable.

 backdrop for model railroad module construction

Applying the ground cover. Ground foam to simulate the dry southwest.

model railroad module construction ground cover

The basic “near distant” hills under construction. Just pieces of ceiling tile for the basic form.

 HO scale hill formation

The hills covered with plaster cloth. Ready for the Sculptamold.

plaster cloth mountain for model railroad module construction

Sculptamold that has been colored with the craft paints I use for the dirt color I wanted.

sculptamold

Progress at Deming. I painted the “Distant” hills with my craft paints. They just need to be a background without details. Too much detail would be a distraction form where I want you to look.

hills for model railroad

Nearly finished look at Deming.

hills for model train model railroad module construction

The all important crowd listening to the President. The crowd scene took a lot of thinking. Colored figures are very expensive. There aren’t many of them available if any for the era.

Eventually, I bought a bag of about 50 or so unpainted figures. Next, I spray painted them all a light shade of black. Then, I painted flesh colored hands and faces.

For some of the women, I painted some skirts a grey color for variety. The figures were then glued to two pieces of styrene so they could be easily removed. Harrison was a rather large man. I found a set of “rotund” figured and used one of them as the President.

 crowd for model train whistle stop tour

The “Horse Power” of the day.

HO scale horses

The carriages. These were the hardest part of the model railroad project. These kits are very difficult. I forgot the name of the kit.
Connecting the wheels to the axles and getting them square was a chore.

HO scale buggies

The locos.

HO scale locomotive

General views of the area in New Mexico.

The “other side” of the modules. The basic ceiling tile rock construction. Remember that there are three parts to the layout. That spiral staircase was pretty tight. Even the mountains had to be removed. This is the left mountain.

model railroad module construction hills

This is the right module. The black part you will partly block the view of a train. This is at the curve seen in the track plan photo. This will add interest as will the tunnel in photo 16.

model railroad module construction hills

This is the middle module with out the view block in place.

model railroad module construction rocks

General overall view of the mountain side of the module consruction, unfinished.

 model railroad module construction rocks

Note the different colored layers of the rocks.

 model train HO scale rock formation

Model railroad module construction finished look.

model railroad module construction finished

Sun set.

model railroad module construction finished

Midday.

model railroad module construction overhead view

The layout in place at the Benjamin Harrison Museum toy room.

model train museum display

The man himself. Full sized image.

model train museum display

This was a challenging and rewarding adventure. I never thought I would be featured in a museum. In a sense this made me a “professional” model railroader. If you don’t add the hours of work, I did earn a little cash. It was the opportunity that made the project worth the time. I hope you liked the model railroad module construction project.

Dan*

A huge big thanks to Dan for sharing his museum model railroad module construction – really enjoyed the history background too.

You can see more of Dan in the Hall of Fame.

That’s all for today folks.

Please do keep ’em coming.

And if today is the day you stop dreaming and start doing, the Beginner’s Guide is here.

Best

Al

PS Latest ebay cheat sheet is here.

PPS More HO scale train layouts here if that’s your thing.





model train answers

12 Responses to Model railroad module construction

  1. santafedan says:

    A person who has become a friend, recommended me for the project. He had seen my model work and the rest is history.

  2. Don says:

    well done, love the Presidential train & the landscape

  3. Fred (skull ) Anderson Melbourne Australia says:

    Very good terrain building ,good colours and backdrops

  4. Rich B. says:

    Just mesmerizing, though the wood stained borders looked pretty good without skirting. And to get the trains, buildings, carriages/horses even period correct.

    Rich

  5. Steve says:

    Excellent work! Very timely for me as I have just started (attempting) to scratchbuild a 4mm scale Pullman car similar to the one shown in the old photos from the whistle-stop tour. The Midland Railway in the 1870s used some imported U.S. Pullmans and I have always fancied a model of one. I am using a “how-to” article from the Feb 1965 Railway Modeller by the late, great David Jenkinson. If I ever get it done 😏 I will send in a picture to Al.

  6. Brian Olson says:

    Why someone invented the word “Magnificent!”

  7. Rob McCrain says:

    Dan, what a great idea it is to put the copper tubes where the sections join at the bolt holes. I wish I had known about that when I built my CONW layout in n scale. It wouldv’e solved a couple of problems I had with the layout. You have a great museum and train room, plus a lovely layout too. Rob

  8. Rob says:

    Wonderful job! I am a former modeler who has no business critiquing anybody’s work on this site. That said do you notice how the skirting compliments the overall look of the layout? I am a nut for blending the border (fascia) of the table with colors that are similar to the scene instead of the hard break created by some with treatments that have no connection at all. This is a case in point where the foreground leads the eye into the scene gently and compliments and enhances the overall effect. Jus’ Sayin’ Cheers! Foreground Rob

  9. Jim AZ says:

    A truly amazing creation of history and scenery. The terrain and coloration is quite stunning and realistic. Great job. Thanks for sharing.

    Jim AZ

  10. robert dale tiemann says:

    presidential train, very nice. love the terrain.

  11. Andrew Aves says:

    Wonderful, interesting and historic model, it must be an excellent additional attraction at the museum.
    Separately I was intrigued by the dual track gauges seen in the Royal Gorge in Colorado photo. Does anyone know the reason for this?
    The only place I have seen more than one gauge in the same location is at Peterborough, South Australia where three railroads met – Standard, broad and narrow gauge. There is a turntable at the Steamtown Rail Museum in Peterborough with all three gauges.
    Andrew in Oz

  12. santafedan says:

    At the time of the photos dual gauge was common in the area. The Rio Grand railroad had 3 foot track and in some places the 4’81/2″ was beginning to take over.
    There are still 3 foot track trains running in Colorado. The Durango and Silverton is a good example. Where they mingled you would find a mix of the two.

Leave a Reply

Your email address will not be published. Required fields are marked *